← Blog

Outsourced Software Development in 2026: What to Require When Your Supplier Uses Agents

Marco Masut

Outsourced software development is the practice of paying an outside company, usually a software house or agency, to design and build software that you then own and run. In 2026 the contract question has changed: many suppliers now have AI agents write part of the code, so the useful question is no longer whether they use AI but what they hand over together with the code. A buyer can protect themselves with five written requirements: a declared policy on agent use, a defined scope for every change, checks run by the pipeline rather than by whoever wrote the change, a named human who approves each release, and a record that lets someone reproduce what was built and verified months later. A supplier that already works this way can accept all five without friction, and one that cannot will tell you quickly.

Why did the old questions stop working?

Buying outsourced development has always meant buying a result without watching the process. While the process was made of people, trust was enough: you checked references, looked at past projects, and relied on the supplier's reputation to stand in for what you could not see.

That proxy weakens when a share of the work is done by agents. A reference tells you about the people, not about which parts of your system a model generated, who looked at them, or what was checked before release. The METR randomised trial published on 10 July 2025 found experienced developers took 19% longer with AI tools while believing they were faster. Confidence about a change, from a person or a model, is weak evidence about it.

Is asking whether they use AI the wrong question?

Yes, for two reasons. First, the honest answer is almost always yes, and a "no" is either untrue or a sign the supplier is behind. Second, a yes tells you nothing about risk. A supplier using agents inside a disciplined process can be safer than one using none inside a loose process.

The better question is about output: what do you receive with the code? Compare the two kinds of delivery:

| | Code only | Code plus evidence | | --- | --- | --- | | Scope | "It's in the repository" | The agreed scope of each change, written before work started | | Checks | "Tests pass" (reported by the author) | Results produced by the pipeline, stored with the release | | Approval | A ticket marked done | A named person's signature on each release | | Later questions | Answered from memory | Answered from a record |

What are the five things to require in the contract?

  1. A declared policy on agent use. The supplier states in writing whether agents touch your code, with which tools, and under what rules about data leaving the environment.
  2. Scope defined per change. Each change names what it may modify before work starts, so a reviewer can see when something wandered outside it.
  3. Independent verification. Tests and checks are run by the pipeline, not reported by the person or tool that wrote the change.
  4. A named human approval. Each release has a person who takes responsibility, recorded in a way that cannot be edited afterwards.
  5. A reproducible record. For any release, the supplier can show what was built and what was verified, and keeps it for an agreed period after the contract ends.

None of these forbids using agents. They ask for the same thing you would ask of any trade that touches your property: say what you did, show it, and sign for it.

What does good look like in a delivery handover?

At handover, ask for a short package alongside the code. It should contain the list of changes with their original requests, the scope each one was allowed to touch, the check results for the final release, the approvals, and the exceptions: every point where a check failed and someone overrode it, with the reason.

The exceptions list is the most informative part. A project with no recorded exceptions is either unusually clean or not recording them. For the wider logic of what a record must hold, see the software audit trail when an agent made the change, and for what to ask a supplier before signing, the vendor risk assessment questions for AI-assisted suppliers.

How can you check without slowing the project down?

You do not need to audit every change. A light routine is enough:

  • At signing: put the five requirements in the contract and ask the supplier to describe, in one page, how they meet them.
  • At each milestone: sample one or two changes and ask to see the request, scope, check result and approval for each. If the supplier can produce them in minutes, the process exists.
  • At handover: receive the evidence package and keep it with the code.

If your team is also choosing the tools behind this, the guide to evaluating Claude Code for a team covers what to test before rollout.

What if you are the supplier?

Read the list from the other side. These five requirements are what your clients will put in their contracts next, and the suppliers that can meet them without scrambling will win the work. This is the principle behind Detent, the end-to-end delivery system: the system prepares the change and its evidence, a person signs, and nothing is released without that signature.

A practical first step is small: add requirements 3 and 4 to your next contract, and ask for one sampled change at the first milestone.