A change control process is the set of steps that decides whether a change to a production system may go ahead: someone requests it, someone assesses its risk, a named person approves or rejects it, and the outcome is recorded. Its purpose is to make every release traceable to a decision. When an AI agent writes the change, the five steps stay the same, but the evidence has to be produced while the work happens, because the person approving did not write the diff. The agent's own report is not evidence. The pipeline's checks are. In practice that means the request, the declared scope, the diff, the verification output and the approver's name are recorded at the step where each one appears, not reconstructed at the end. The decision stays with a human, and the signature is the one step that cannot be delegated to the agent that made the change.

What are the five steps of a change control process?

The names vary between frameworks, but the sequence is stable.

| Step | Question it answers | Output | | --- | --- | --- | | 1. Request | What is being changed, and why? | A written request with an owner | | 2. Assessment | What can this break, and how do we undo it? | Scope, risk class, rollback plan | | 3. Approval | Who accepts this going out? | A named, dated decision | | 4. Implementation and verification | Did it do what was approved, and only that? | Diff, check results, test output | | 5. Record and closure | Can someone reconstruct this in a year? | A single linked record |

The change advisory board is the body that sits at step 3 for risky changes. This piece is about the procedure around it: what has to exist before the board, or a single approver, can decide anything.

Where does an agent-generated change differ?

In two places, both about evidence, not about the process itself.

First, the author cannot be questioned afterwards. With a human change, the reviewer can ask "why did you touch this file?" The agent's session is gone, or its explanation is a fresh account of what it did, not a record of it. Anything the approver will need has to be written down during the session.

Second, the author's confidence is not a signal. The METR randomised trial published on 10 July 2025 found that experienced developers took 19% longer with AI tools while believing they were faster. A model that says "tests pass" is in the same position: the statement is cheap, the check is not. The pipeline has to run the checks and the record has to hold their output.

Everything else, including the approval step, works as it did before. That is the point: the process does not need to be rebuilt, only fed differently.

What should you record at each step?

A short checklist, one line per step:

  1. Request: the original ask in the requester's words, the requester, the date, the linked ticket.
  2. Assessment: the declared scope (files, services, data), the risk class, the rollback plan, and whether it collides with another change or a freeze window.
  3. Approval: the approver's name, the time, and what they were shown when they approved.
  4. Implementation and verification: the diff, whether it stayed inside the declared scope, the checks that ran and their raw output, executed by the pipeline.
  5. Closure: the release identifier, the outcome, and a link to every earlier item.

The test is simple: could a person who was not there reconstruct why this change reached production, using only the record? The structure of such a record is described in software audit trail when an agent made the change.

Who signs, and when?

One named person, after the evidence exists, before the release. Three rules keep that honest:

  • The approver is not the author. If an agent produced the change, the approver is a human who reads what it left behind. If a person prompted the agent, that person can approve a low-risk class only if your policy says so explicitly.
  • The signature follows the evidence, not the other way round. Approving before the checks have run turns the signature into a promise, not a decision.
  • The risk class sets the signer. Routine changes can go to one named approver. Changes to customer data, payments, permissions or secrets go to the board, or to someone with the authority to accept that risk.

An approval with no name, or a name nobody can tie to a specific moment, is not a control. It is the appearance of one.

How do you map the process to a delivery pipeline?

Each step has a natural place in a pipeline, which is what lets a system do the preparation and leave the decision to a person.

  • Request and assessment become the contract the agent works under: scope, allowed paths, checks to run. The scope is declared before the work starts.
  • Verification is a pipeline stage the agent cannot mark as passed on its own. The check is run by the runner and its output is stored.
  • Approval is a gate: the release does not proceed until a person signs, and the signature is a cryptographic event in the record, not a field someone can edit.
  • Closure is automatic: the record links the request, the diff, the output and the signature.

This is how Detent, the end-to-end delivery system is built: the system prepares the change and its evidence, a person signs, and nothing is released without that signature. For how this fits the wider delivery model, see AI software development, and for how tools compare on what they leave behind after the session, see the benchmark.

A practical first step: pick the last three changes an agent contributed to, and try to fill the five steps from the record alone. The empty cells show where your process depends on someone's memory.